Repair of EDV rotor
Repair of EDV rotor 250 kW for Bukhara Refinery. The following was done:
- Rotor shaft spectral analyses to define material grade.
- Machining of bearing journal for bearing installation from fan side.
- Shaft surfacing for bearing.
- Manufacturing of new bronze sleeve.
- Chips removing form half-coupling surface.
- Rotor balancing with half-coupling and fan.